News Source: City of Casa Grande
Traffic Advisory: Colorado Road Construction
Beginning on Monday, November 17, and lasting approximately four weeks, contractors for The Lofts Apartments project will begin a water line tie-in along Colorado Road between Kortsen Road and Palo Verde Street.
Work is scheduled between 7:00 a.m. and 4:00 p.m., Monday through Friday. During this time, traffic will be shifted to accommodate construction activity.
Drivers are encouraged to slow down, use caution, and stay alert when traveling through the area.
Traffic Advisory: Metronet Cable Installation Along Arizola Road
Beginning Wednesday, November 12 and continuing through December 12, Metronet will be installing fiber cables in the neighborhoods along Arizola Road between Carolyn Way to south of Florence Boulevard. Metronet will notify residents via roadside message board and door knockers. Crews are scheduled from 7 a.m. to 4 p.m.
Residents with questions about installation should contact Metronet directly for assistance.
Traffic Advisory: Peart Road and O’Neil Drive
Arizona Water has begun a water line tie-in project for a private developer at the intersection of Peart Road and O’Neil Drive. The work is expected to continue through November 30.
During this time, traffic will be shifted, and lanes will be restricted to allow crews to complete the project. Traffic impacts will remain in place 24 hours a day for the duration of the work.
Drivers are encouraged to slow down, use caution, and stay alert when traveling through the area.
For updates on traffic impacts citywide, sign up for CGAlerts.






